Project Status Updates

Public Works Ian Projects

Hurricane Ian Projects

Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

Dorchester Street Sidewalk

Dorchester Street Sidewalk

Last Updated: 03/12/2025 Category: Sidewalks Current Phase: Construction

 Dorchester Street Sidewalk

Read More

Bissett Park

Bissett Park

Last Updated: 02/28/2025 Category: Parks And Recreation Current Phase: Construction

Creation of park master plan and phase 1 development

The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season. 

Read More

Lake Betty Park

Lake Betty Park

Last Updated: 02/28/2025 Category: Parks And Recreation Current Phase: Construction

Park master plan for Lake Betty Park

Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.

Read More

Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance

Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance

Last Updated: 02/28/2025 Category: Roadway Current Phase: Planning and Project Approval

The design, permitting, and construction of a new gated access trucking road into the mini-transfer station. 

Read More

Myakka Park News Image

Myakka Park

Last Updated: 02/28/2025 Category: Parks And Recreation Current Phase: Design Development

Creation of a master plan through the park design process and phase 1 development.

Read More

Weir Inspection and Repair Design

Weir Inspection and Repair Design

Last Updated: 02/28/2025 Category: Drainage Current Phase: Planning and Project Approval

The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged.  The cause of the damage is not known.  An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.  

Read More

Bayshore Live Oak Park - West Fishing Pier

Bayshore Live Oak Park - West Fishing Pier

Last Updated: 02/27/2025 Category: Parks And Recreation Current Phase: Planning and Project Approval

Total replacement of the western fishing pier at Bayshore Live Oak Park.

Read More

Building D Renovations

Building D Renovations

Last Updated: 02/26/2025 Current Phase: Construction

Read More

EOC Expansion

EOC Expansion

Last Updated: 02/26/2025 Current Phase: Design Development

The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach an collaborative problem solving to ensure timely protective actions, a more educated, informed and prepared population and resilient infrastructure.

Read More