Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 03/12/2025 Category: Sidewalks Current Phase: Construction
Dorchester Street SidewalkLast Updated: 02/28/2025 Category: Parks And Recreation Current Phase: Construction
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.
Last Updated: 02/28/2025 Category: Parks And Recreation Current Phase: Construction
Park master plan for Lake Betty Park
Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.
Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance
Last Updated: 02/28/2025 Category: Roadway Current Phase: Planning and Project Approval
The design, permitting, and construction of a new gated access trucking road into the mini-transfer station.Last Updated: 02/28/2025 Category: Parks And Recreation Current Phase: Design Development
Creation of a master plan through the park design process and phase 1 development.Weir Inspection and Repair Design
Last Updated: 02/28/2025 Category: Drainage Current Phase: Planning and Project Approval
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.Bayshore Live Oak Park - West Fishing Pier
Last Updated: 02/27/2025 Category: Parks And Recreation Current Phase: Planning and Project Approval
Total replacement of the western fishing pier at Bayshore Live Oak Park.Last Updated: 02/26/2025 Current Phase: Design Development
The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach an collaborative problem solving to ensure timely protective actions, a more educated, informed and prepared population and resilient infrastructure.